Class Code: 6319

GAS MAIN OR CONNECTION CONSTRUCTION & DRIVERS

Per NCCI's Scopes Code Description:

"Code 6319 is applicable to the construction of gas mains, steam mains, water mains or construction that connects these types of mains. Separately rate tunneling in connection with this type of construction unless the tunneling is conducted at street crossings without the use of air pressure. The construction of pipelines from natural gas producing fields to local distribution systems is also separately rated. The excavation of land, when performed by the contractor who is engaged in the construction or installation of mains, is additionally contemplated by Code 6319 as is any landscaping work performed in connection with the construction operations. The classification additionally includes the fabrication of pipe, couplings, pipe fittings, e.g., “T”s, elbows, bushings, adapters, etc., to be used in conjunction with the pipeline construction."

Rate per $100. of Renumeration:  $ 5.19

Please see the attached graph for the 25 year rate history of this workers' compensation class code in the State of Florida .

Click here To View all of the of Class Codes and Rates.

 Let Work Comp Associates help you with a program for your firm.

Request a Quote for Workers' Compensation

or

Call us today at 1-844-WCA-FLWC

                              

Construction Exemption Required:    No

Workers Compensation Brochures/Forms/Posters

Workers Compensation Case Law 

Workers Compensation Class Codes & Rates

Workers Compensation FAQ

Workers Compensation Glossary

Workers Compensation Links

CONTACT US

"It's not hard to make decisions once you know what your values are." 

 

Roy E. Disney

© 2017 by Work Comp Associates, Inc. All rights reserved.

  • s-facebook
  • s-linkedin
  • Pinterest Metallic
  • Twitter Metallic